Project Description

Hygienik Systems has worked closely with the Estates Department of the NHS Sheffield Teaching Trust on major refurbishments of the two hospitals.

The installations included operating theatres, scrub areas and consultation rooms in the Royal Hallamshire and Northern General hospitals.

Hygienik Systems delivered high-specification materials and finishes, bespoke installation expertise and substantial cost savings. The 5-week project included the installation of over 750 square metres of Pastel Green 2.5mm K-Panel sheet from Hygienik’s Feature Wall range.

Hygienik uses both hot-welded and cold-welded joints to achieve the fully-bonded systems which meet stringent NHS infection control criteria.

We provided the Estates Teams with NBS docs to demonstrate compliance to all infection control, robustness and safety specifications. These documents are available on request.