Trafford General Hospital, Manchester
Hygienik completed the refurbishment of two Wards at Trafford General Hospital installing over 1,000 square metres of antimicrobial wall cladding during the period when the UK subject to full lockdown conditions.
ImageClad & Large Format graphics
Hygienik can design, print and apply large format graphics at the same time as we install PVC hygienic wall cladding sheets. We have produced bespoke ImageClad wall graphics for a variety of healthcare and educational environments.
Lewisham Hospital, London
Hygienik installed wall and shower linings in a new wing of Lewisham Hospital in South London. We installed wall linings in 180 new assisted shower rooms in a new wing of University Hospital...
UK Healthcare Projects ‘A to Z’
Hygienik Systems has successfully completed dozens of installation projects for the UK's leading NHS hospitals. We work closely with Estates Teams to establish the highest hygiene standards...
Royal Hallamshire, Sheffield
Hygienik Systems has worked closely with the Estates Department of the NHS Sheffield Teaching Trust on major refurbishments including operating theatres, scrub areas, consultation rooms...
Guy’s and St Thomas’, London
Installing temporary walls both inside and outside the main entrance of Guy's Hospital included the commission of bespoke graphics to inform patients and staff of the changes taking place and directional signage...