Leisure Centres

Leisure Centres

Project Description

A series of ‘before’ and ‘after’ photographs show how a tiled changing room and shower area was transformed by installing expertly fitted hygienic cladding.

Although this project was completed more than a decade ago, it illustrates how aging facilities can be upgraded quickly and cost-effectively.

The Hygienik team fitted cladding to the walls and shower areas before installing a new hygienic ceiling.  Hygienik’s 10mm H-Panel PVC ceiling tiles were dropped into the new ceiling grid.